I.E.D. Installations gains Cyber Essentials Accreditation
I.E.D Installations gains Cyber Essentials Accreditation
I.E.D. Installations has completed an important phase of a Cyber Security in gaining the Cyber Essentials Certificate of Assurance. Cyber Essentials assists I.E.D. Installations to guard against the most common cyber threats and demonstrates our commitment to cyber security.
(more…)
CAPTAIN SIR TOM MOORE BUILDING
Captain Sir Tom Moore Building
I.E.D. successfully completed this project at Halton Hospital – The Captain Sir Tom Moor Building Breast Screening Unit – Project Delivered on time in accordance with the Contract Programme. The Programme was a 10 Week Turn round to Modify and expand the existing system to include lighting & Power, and all Life Safety System whilst working within the Hospital, the ward amendments were phased to hand back the use of each area due to the nation demand and to retain all procedures and Breast Screening appointments, also to provide cutting edge X-Ray Facilities, whilst creating patient care units designed for the comfort during their appointments. The Tom Moore was named after the late Sir Tom Moore, was a prestige NHS change to the Halton Hospital, that will impact on all North West Breast Screening for all Women.
(more…)
HALTON HALTON ENDOSCOPY
Halton Hospital Endoscopy
John Turners Hospital Building Refurbishment Project within Halton Hospital – The project was delivered on time in accordance with the Contract Programme. IED Disciplines Electrical Lighting & Power, Data, Nurse Call, UPS/IPS, Fire, Earthing & Bonding, Mains Distribution, Lightning Protection and All Sub Mains to the AHU to include all testing and commissioning.
(more…)
WARRINGTON NHS HOSPITAL BIRTHING POOL
WARRINGTON NHS HOSPITAL BIRTHING POOL
We had the electrical Lighting & Power, CCTV, Fire, Access Control, Induction Loop, Intruder Alarm & Data Packages.
The Programme was a 39 Week Turn round to Refurbish the Original Ward to create a Bespoke new Birthing Pools an NHS project now rolled out to all sectors up and down the UK which working through live offices and Corridors.
(more…)
CLATTERBRIDGE CANCER CENTRE NHS
CLATTERBRIDGE CANCER CENTRE NHS
We had the electrical & life Safety Package to wire and install a “Link Bridge” from the new Clatterbridge Cancer Hospital to the Existing Royal Liverpool Hospital for the Use of transporting Beds through the Hospital.
(more…)
LIVERPOOL UNIVERSITY HOSPITALS 5th FLOOR REFURBISHMENT
LIVERPOOL UNIVERSITY HOSPITALS 5th FLOOR REFURBISHMENT
This project had a value of £270,000 and was completed in December 2020.
We had the electrical Lighting & Power, Flooring, Decorations and Finishes, Joinery, Data Packages.
The Programme was a 4 Week Turn round to Strip out 40 Offices, of all Decorations, lighting & Power, Floors, perimeter Benches containing Gas and Water, then removal of all Lab equipment dispose away from site whilst working through live offices and Corridors.
(more…)
ALFRED H KNIGHT – VILLIERS ROAD
ALFRED H KNIGHT – VILLIERS ROAD
The project was valued at 1.5 Million, the project turnaround was 40 weeks delivered on time, the Building Delivery and use is to be used for Copper & Mineral Annalistic Testing.
(more…)
EVERTON FC – FINCH FARM TRAINING FACILITY
NEW 1MVA SUB-STATION AND NEW LV SWITCH ROOM
Finch Farm is the main training facility for Everton Football club in Merseyside. It also incorporates other facilities such as an education centre, media centre and various football pitches/training pitches.
The existing sub-station was at capacity and to facilitate future expansion plans a new 1Mva sub-station and LV switch room were required. This project incorporates the work required in relation to diverting existing cables and protecting other live services along the footpath where the new substation is being constructed.
(more…)
Avrenim – Broadgreen Hospital, Alexandra Wing, Ward 7
Completed in January 2020 the project was to completely refurbish the existing ward and upgrade the facilities to create additional bed spaces which included structural alterations, electrical re-fit, new LED lighting, new flooring and suspended ceilings. Works within selected adjacent areas of Ward 7 remained occupied and in use whilst refurbishment works were in progress.
(more…)
Avrenim – Dental Hospital Restorative 5 & 4th Floor Corridor Refurbishment
Restorative 5
The refurbishment of existing dental teaching examination room housing 15 dental chairs. The works comprised of site clearance and preparation works, floor finishes, decorations to new and existing plaster and timber surfaces, new suspended ceiling installation with associated work to new LED lighting, sundry fixtures and fittings and associated mechanical services.
4th Floor Corridor
The refurbishment of the University of Liverpool corridors consisting of new LED lighting, structural door openings, suspended ceilings, floor coverings and decorations.
(more…)